Community Water System Feasibility

A planned technical review to identify whether repair, storage or a new system is appropriate.

Children washing and drinking at a public water tap
Representative editorial image · Not project evidenceWater & WASH — South SudanPhoto: Lisa Marie Theck
CountrySouth Sudan
ProgrammeWater & WASH
StatusPlanned
FundingNot open

Context and proposed response

SS-WASH-001Record v1
Record maturity

The interface gains detail only when the underlying record does.

  1. 01PlanPLANNED
  2. 02FieldAWAITING FIELD RECORD
  3. 03DeliveryNO DELIVERY CLAIMED
  4. 04EvidenceNO PUBLIC EVIDENCE
  5. 05VerificationNOT YET VERIFIED

The need

Assessment before announcement.

The public need statement will follow source testing, demand assessment, access review and consultation with the people expected to operate the system.

This planning record exists to prevent a one-size-fits-all water promise. No source, site or technical solution has been approved.

Proposed scope

What Bidaya would verify and define.

  • Inspect existing sources and repair options
  • Test water quality and measured output
  • Assess storage, drainage and seasonal demand
  • Identify a responsible operator and repair route

Continuation

Plan the handover before the build.

Any approved system must include a maintenance schedule, named operator, spare-parts route and follow-up testing.

A project can move beyond planned status only when the relevant approvals and evidence are recorded.

Delivery model

Inspect the proposed system.

A schematic can explain the work before field photography exists. Before-and-after comparisons will appear only when genuine, approved evidence is available.

Interactive delivery model

Water & WASH

01Source
02Pump
03Treatment
04Storage
05Distribution
06Community

Illustrative system diagram. The actual scope is set only after assessment.

Delivery timeline

One record. Clear stages.

Only stages actually reached are highlighted.

  1. 01Planned
  2. 02Fundraising
  3. 03Funded
  4. 04In Delivery
  5. 05Completed
  6. 06Verified in Use

Verification

What success will need to prove.

not started

Water-quality test

Evidence has not yet been recorded.

not started

Operator handover

Evidence has not yet been recorded.

not started

30-day check

Evidence has not yet been recorded.

not started

90-day check

Evidence has not yet been recorded.